Omron SYSMAC CS1W-CLK13 Operation Manual page 63

Optical ring controller link units, h-pcf/gi cable
Table of Contents

Advertisement

Data Links Procedures
40
7. Set the parameters for automatic data link creation.
Equality Layout: Previous Pattern (Supported by CS1W-CLK13, CS1W-
CLK12-V1, CS1W-CLK53, CS1W-CLK52-V1, CVM1-CLK12, and CVM1-
CLK52)
Contents
Set the data link mode to
manual or automatic.
Area
• Set the area
1
• Set the data link
start word
• Set the number of
data link words
Area
• Set the area
2
• Set the data link
start word
• Set the number of
data link words
Set the first data link status
word.
Set the number of nodes to
participate in the data links.
Method
Use a Programming
Data link startup node
Device for the PLC,
only
including Program-
Note The node that is
ming Console, to set
in the CPU Unit
used as the startup
node.
Data link startup node
only
Note: Only when Area
1 is used
Data link startup node
only
Note: Only when Area
2 is used
Data link startup node
only
Note: Can also be set
as not used.
Data link startup node
only
Section 2-1
Nodes
Page
94
used to start the
data links is
called the star-
tup node. The
node to be used
as the startup
node must be
determined
before data links
can be started.
107

Advertisement

Table of Contents
loading

Table of Contents