Roadway; Inputting Roadway; Horizontal Alignment; Element Method - Titan TTS2 Manual

Table of Contents

Advertisement

10. Roadway

Roadway function is divided into two parts: Design Roadway
and Stake out Roadway. You may stake out designed points
according to the stake and deviation of the Designed Roadway.
Select "[Menu]→4.Program→[F4](P2)→Select file
(.MEA&.COO) and press [Enter]→1.Roadway" to enter the interface
of road menu:
If you have already imported [.LS] files into the instrument from
the external, you may open the [.LS] file through '1.Open Shape file'.
You can choose the three opts after opening the LS file: 'Stake out
(road)', 'Resume H curve' or 'Resume V curve'.

10.1 Inputting Roadway

The input of road design is divided two parts, one of which is the
input horizontal alignment, and the other is vertical alignment. The
input data will be saved in the selected files, whose maximum
number of element is 21, but the number of intersection cannot be
greater than 20;

10.1.1 Horizontal alignment

The input is for road plane design.

10.1.1.1 Element method

Enter this function through 'Re-Define (H)' and 'Resume H
curve' under Roadway menu.
Selecting "Re-define(H)" to enter the interface of "Define(H)":
If you selecting "I.P"(intersection piont) for the first time, you
will input by intersection method.
Select a line type, if you don't input start point, enter the
93

Advertisement

Table of Contents
loading

Table of Contents