Table of Contents

Advertisement

9.4.6 Projection

This function is used to measure the length (X) of the prism
point deviation from the starting point of baseline, distance(Y) of the
prism point deviation from baseline, and altitude difference (Z) of the
prism point deviation from the starting point of baseline.
The preparation before measurement: setting up the instrument
height, the target height and defining the baseline.
Define base line: In the interface of project, press [2](2.Baseline)
to enter the interface of "Setup Baseline";
Retrieve base line point
Press [2](List) to enter the interface of "Project(Begin)", as
shown in the picture below. You can press [Input] to input coordinate,
or [List] to retrieve coordinates, then press [Enter] to enter the
interface of "Project(End)" . After inputting, back to the projection
menu;
Measure base line point
In the interface of "Setup Baseline", press [1](Meas) to enter the
interface of "Project(Begin)",as shown in picture below:
Diagram of "Projection"
85

Advertisement

Table of Contents
loading

Table of Contents