Table of Contents

Advertisement

Press [Meas] to start measuring, then press [Enter] to enter the
interface of "Project(End)";
Press [Meas] to start measuring, then you can press [Enter] to
return to "project" menu and press [3](Project)(3.Project) to start
projection measurement.
Projection
In the project menu, press [3](project) to enter the interface of
"Project-Survey"; press [Meas] to start measuring. After the
measurement, the deviated length(X), distance(Y) and altitude
difference (Z) are displayed on the screen.
The key [T.H] is used for re-inputting target height; the key
[Turn] using for switching the display between "X,Y,Z" or
"SD,HD,VD";

9.4.7 Roadway

See reference in chapter 10. Roadway

9.5 Options

Menu of options:
Press [F4](Turn)→
86

Advertisement

Table of Contents
loading

Table of Contents