BRP E-TEC EVINRUDE Manual page 225

Hide thumbs Also See for E-TEC EVINRUDE:
Table of Contents

Advertisement

Place the shift rod in the shift rod lever. Install the
retaining pin and washer. Tighten pin to a torque
of 60 to 84 in. lbs. (7 to 9.5 N·m).
1. Shift rod screw
Check shift linkage adjustment. Refer to Shift
Linkage Adjustment on p. 228.
IMPORTANT:
Make sure the gearcase shifts
completely into both forward and reverse and that
propeller shaft spins freely in neutral.
Apply Nut Lock to threads of exhaust water valve
screws and tighten to a torque of 60 to 84 in. lbs.
(7 to 9.5 N.m).
1. Exhaust water valve
1
002171
1
004293
Connect cooling water hoses to exhaust housing.
2
1. Overboard indicator hose
2. Drain hose
Connect the power trim connectors and exhaust
water valve connector (60 HP 2-cylinder). Secure
cables in clamps.
Rope Start Models
Install throttle cable and tiller shift rod.
4
1. Cable anchor
2. Anchor screw
3. Cable retainer
4. Shift rod retainer
Refer to Throttle Cable Adjustment on p. 278, or
Throttle Cable Adjustment on p. 289.
Powerhead
Powerhead Installation
1
004298
1
2
3
006526m
225
10

Advertisement

Table of Contents
loading

Table of Contents