4. Remove the bolts fixing the Top Frame, and remove
the Top Frame. Then, remove the rest of the Stays.
(size of bolts : 12mm)
- If you remove the bolts, the Top Frame will fall down.
The Top Frame must be supported by one person
while another is removing the bolts.
- Do not remove the bolts at the Bottom Frame before
the Top Frame is removed. The Top Frame will fall
down.
5. Peel off all the films wrapping around the machine.
6. Remove the 4 retainers. (size of bolts : 17mm)
Then, the machine can be unloaded from the skid.
7-3