Site Preparation Checklist for NFX350 Devices

The checklist in
Table 19 on page 42
NFX350 devices installation.
Table 19: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
device tolerances.
Power
Measure distance between external power
sources and device installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of devices
you want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the device.
Plan rack or cabinet location, including
required space clearances.
summarizes the tasks you need to perform when preparing a site for
For More Information
"Environmental Requirements and
Specifications for an NFX350
Device" on page 44
"AC Power Supply Specifications
for an NFX350 Device" on page 36
"NFX350 Network Services
Platform Overview" on page 18
"Rack Requirements for NFX350
Devices" on page 47
"Cabinet Requirements for an
NFX350 Device" on page 49
"Clearance Requirements for
Airflow and Hardware
Maintenance for an NFX350
Device" on page 46
Performed by
42
Date