Download Print this page

Suzuki GA413 Service Manual page 550

Hide thumbs Also See for GA413:

Advertisement

2. Main shaft
4. Bearing
5. 3rd gear
3. Main shaft rear bearing
4. Main shaft
5) Remove countershaft reverse gear (1) and center bearing (3)
with puller (2) and hydraulic press.
6) Remove countershaft from lower case.
7) Remove circlip (3) from countershaft front end and pull out bear-
ing (2) by using special tool.
Special Tool
(B): 09913-60910
1. Countershaft
INPUT SHAFT AND MAIN SHAFT
1) Take out input shaft (1) by hand, taking care not to let high-
speed synchronizer ring (3) fall off.
2) Remove circlip of input shaft (1) and pull out bearing (2) with
puller (3) and hydraulic press as necessary.
NOTE:
Sealed bearing must not be washed. Replace it with new
one when required.
3) Remove circlip (1) and then speed sensor rotor (2) from main
shaft.
MANUAL TRANSMISSION 7A-11

Hide quick links:

Advertisement

Chapters

loading