Download Print this page

Suzuki GA413 Service Manual page 66

Hide thumbs Also See for GA413:

Advertisement

1B-12 AIR CONDITIONING
1. Pressure
2. Movable contact
3. Pressure switch terminal
A/C evapo. thermistor
Check resistance between terminals.
Sensor Temperature (5C (5F))
If it is not within specification, replace thermistor.
NOTE:
When the thermistor is removed, its should be reinstalled in
original position.
Expansion valve
Refer to TROUBLESHOOTING PROCEDURE USING MAN-
IFOLD GAUGE SET earlier in AIR CONDITIONING BASIC
MANUAL.
1. Expansion valve
DUAL PRESSURE SWITCH
INSPECTION
1) Check switches for continuity at normal temperature (approx.
255C (775F)) when A/C system has a proper charge of refriger-
ant and when A/C system (compressor) is under operation. In
each of these cases, switches should show proper continuity.
2) When pressure is following specified pressure, switch should
show no continuity.
Tightening torque for dual pressure switch
11 N·m (1.1 kg-m, 8.0 lb-ft)
A/C SWITCH
REMOVAL AND INSTALLATION
Refer to HEATER CONTROL LEVER ASSEMBLY in Section 1A.
0 (32)
25 (77)
High side pressure
2
200 kPa (2.0 kg/cm
) or below
2
3200 kPa (32 kg/cm
) or above
Resistance (kW)
6.3 – 7.0
1.8 – 2.2
Dual pressure switch
No continuity
No continuity

Hide quick links:

Advertisement

Chapters

loading