APRILIA SCARABEO 500 2008 Service Station Manual page 221

Hide thumbs Also See for SCARABEO 500 2008:
Table of Contents

Advertisement

SCARABEO 500
Engine
- Remove and wash the rotors thoroughly with pet-
rol and compressed air.
- Extract the shaft with its gear and check that it is
in good working order and without signs of wear.
- Reassemble the rotors in the pump body, keep-
ing the 2 reference marks visible.
- Slide in the shaft with the gear and install the lock
ring; afterwards turn it with the opening opposed
to the shaft face.
- Check any irregular clearance between shaft and
pump body.
- Measure distance between rotors with a thick-
ness gauge at the position shown in the picture.
Characteristic
limit clearance allowed:
0.012 mm
- Measure the distance between the outer rotor
and the pump body (see figure).
Characteristic
limit clearance allowed:
0.25 mm
ENG - 221

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents