Perform Engine Maintenance - Ford Models; Perform Engine Maintenance - Perkins Models - Genie S-40 Service Manual

Hide thumbs Also See for S-40:
Table of Contents

Advertisement

October 2014
A-12
Perform Engine Maintenance -
Ford Models
The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 30 days of usage. After this interval, refer to
the maintenance tables for continued scheduled
maintenance.
• Oil, coolant, fuel, exhaust and vacuum hoses -
check for leaks, damage or deterioration
• Electrical wiring - check for chafing or damage
Required maintenance procedures and additional
engine information are available in the
Ford MSG-425 EFI Operator Handbook
(EDI part number 1020010)
Ford MSG 425 EFI Operator Handbook
Genie part number
Part No. 826364
A-13
Perform Engine Maintenance -
Perkins Models
Engine specifications require that this procedure be
every 50 hours or weekly, whichever comes first.
Proper engine maintenance, following the engine
manufacturer's maintenance schedule, is essential
to good engine performance and service life. Failure
to perform the maintenance procedures can lead to
poor engine performance and component damage.
Perkins 400 Series Operation Manual
(Perkins part number TPD 1443S)OR the
Perkins 404F Series Operation Manual
(Perkins part number SEBU8609).
Perkins 400 Series Operation Manual
215322
Genie part number
Perkins 404F Series Operation Manual
Genie part number
S-40 • S-45 • S-40 TRAX • S-45 TRAX
Section 3 • Scheduled Maintenance Procedures
CHECKLIST A PROCEDURES
• Fuel pre-filter/water seperator- drain
94890
1251562
3 - 13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-45 traxS-45

Table of Contents