Siemens SCALANCE W788-1PRO Operating Instructions Manual page 120

Hide thumbs Also See for SCALANCE W788-1PRO:
Table of Contents

Advertisement

Configuration Using Web Based Management and the Command Line Interface
Command
setec MS <E|D> <E|D>
<E|D> <E|D>
setec CT <E|D> <E
|D>
<E|D> <E|
D>
setec IS <E|D
> <E|D>
<E|D> <E|D>
setec LI <E|D> <E|D>
<E|D> <E|D>
setec IQ <E|D> <E|D>
<E|D>
<E|D>
setec CA <E|D> <E|D>
<E|D>
setec RD <E|D> <E
|D>
<E|D> <E|D>
Operating Instructions SCALANCE W78x
C79000-G8976-C184-07
Description
Reaction when the update time in
iPCF mode with PNIO support
cannot be k
ept to due to a
additional client.
Reaction when the specified update
time in iPCF mode with PNIO
support cannot be kept to.
Reaction to a change in the
connection status on a client for
which the IP-alive monitoring is
activated.
Reaction when establishing a
connection monitored with the Link
Check function.
Reaction to a change in the iQoS
status.
Reaction to a change in the client
authentication status.
Reaction to a change in the
redundancy event status.
Comment
This command is
available only on the
n
SCALA
NCE W788-
and SCALANCE W788-
2RR models but not
client mode.
This command is
available only on t
SCALANCE W788-1RR
and SCALANCE W788-
2RR models but not in
client mode.
If
the connection status
c
hanges, an event is
triggered. If the
connection no longer
exists, the error state is
triggered and the error
L
ED is lit.
T
his command is not
available in the client
mode.
T
his command is not
available in the client
mode.
This command is not
availabl
e in the clien
mode.
This command is not
available in the client
mode.
T
his command is not
available in the client
mode.
1RR
in
he
t
120

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scalance w788-1rrScalance w788-2rrScalance w788-2pro

Table of Contents