Tools And Material; Installing The At-Gs924Mx Switch - Allied Telesis AT-GS924MX Installation Manual

At-gs900mx series gigabit ethernet switches
Hide thumbs Also See for AT-GS924MX:
Table of Contents

Advertisement

Tools and
Material
Installing the
AT-GS924MX
Switch
Here are the required tools and material for installing the switch on a wall:
Eight bracket screws (included with the switch)
Two wall or equipment rack brackets (included with the switch)
Two wall screws (included with the switch)
Two anchors for a concrete wall (included with the switch)
Flat-head screwdriver (not provided)
Cross-head screwdriver (not provided)
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring (not provided)
Drill and a 1/4" carbide drill bit for a concrete wall (not provided)
Caution
The supplied screws and anchors may not be appropriate for all
walls. A qualified building contractor should determine the hardware
requirements for your wall prior to installing the chassis.
Please review "Reviewing Safety Precautions" on page 50 and "Selecting
a Site for the Switch" on page 60 before performing this procedure.
To install the AT-GS924MX Switch on a wall, perform the following
procedure:
1. Place the switch on a table or desk.
2. Perform Step 1 to Step 3 in "Installing the Switch in an Equipment
Rack" on page 62 to remove the rubber feet from the bottom of the
switch.
3. Position the two short brackets that come with the switch against the
sides of the unit as shown in Figure 26 on page 72, and secure them
with eight screws, also included with the switch.
AT-GS900MX Series Installation Guide for Stand-alone Switches
E74
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs924mpxAt-gs948mxAt-gs948mpx

Table of Contents