Powering On The Switch; Figure 45: Installing The Retaining Clip - Allied Telesis AT-GS924MX Installation Manual

At-gs900mx series gigabit ethernet switches
Hide thumbs Also See for AT-GS924MX:
Table of Contents

Advertisement

Chapter 6: Powering On the Switch

Powering On the Switch

98
Before powering on the switch, refer to "Power Specifications" on
page 116 for the power specifications.To install the power cord retaining
clip and power on the switch, perform the following procedure:
1. To install the power cord retaining clip, position it with the "u" part
facing down, press in the sides, and insert the ends of the clip into the
holes in the retaining bracket on the AC connector. See Figure 45.
Figure 45. Installing the Retaining Clip
2. Raise the retaining clip. See Figure 46 on page 99.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs924mpxAt-gs948mxAt-gs948mpx

Table of Contents