Monitoring The Initialization Processes; Figure 49: Switch Initialization Messages - Allied Telesis AT-GS924MX Installation Manual

At-gs900mx series gigabit ethernet switches
Hide thumbs Also See for AT-GS924MX:
Table of Contents

Advertisement

Monitoring the Initialization Processes

Bootloader 3.0.10 loaded
Press <Ctrl+B> for the Boot Menu
Reading filesystem...
Loading flash:gs900-5.4.4E-0.1.rel...
Verifying release... OK
Booting...
Starting base/first...
Mounting virtual filesystems...
______________
/\ \
/
\ \_
/
\ |
/
\ \
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v5.4.4E
Current release filename: gs900-5.4.4E-0.1.rel
Original release filename: x310-5.4.4E-0.1.rel
Built: Wed Jan 14 13:42:17 NZDT 2015
It takes about one and a half minutes for the switch to initialize its
management software programs and features, and load the default
configuration. You may monitor the progress of the initialization process by
watching the switch ID LED. It displays the number "8" for the first minute
and afterwards the number "1."
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program to the Console port on the
master switch. The messages are given in Figure 49 here to Figure 51 on
page 103. The messages may differ slightly depending on whether your
switch is a PoE or non-PoE model.
After the switch has initialized its management software, go to
"Configuring the Switch for Stand-alone Operations" on page 104.
____
/ /______\
__/ /| ______ |
|
/
| ______ |
/ /
\ ____ /
Figure 49. Switch Initialization Messages
AT-GS900MX Series Installation Guide for Stand-alone Switches
[
OK
[
OK
]
]
101

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs924mpxAt-gs948mxAt-gs948mpx

Table of Contents