Yamaha FZR400 1988-1989 Service Manual page 175

Table of Contents

Advertisement

INSPECTION AND REPAIR
Connecting Rod Oil Clearance
1. Clean all parts thoroughly.
2. Install:
Connecting rod bearings
??
Into the connecting rod and cap.
3. Attach:
Onto the crank pin.
4. Install:
Connecting rod
??
Connecting rod cap
??
NOTE:
??
Be sure the "Y" marks @ on the connecting
rods face toward left crankshaft end .
Be sure the letters on both components align
??
to form a perfect character.
5. Lubricate:
Bolt threads (Connecting rod)
??
Nut seats (Connecting rod)
??
Molybdenum
6. Tighten:
Nuts (Connecting rod cap)
??
Do not turn the connecting rod until the
clearance measurement has been completed.
Tighten to full torque specification without
pausing. Apply continuous torque between
1.2 and 2.3 m-kg. Once you reach 1.2 m-kg
DO NOT STOP TIGHTENING until final torque
is reached. If tightening is interrupted between
1.2 and 2.3 m-kg, loosen nut to less than
1.2 m-kg, and start again.
Nuts (Connecting Rod) :
23 Nm (2.3 m-kg, 17 ft-lb)
Disulfide
Grease
I

Advertisement

Table of Contents
loading

Table of Contents