Checking Coil Windings Resistance - Husqvarna TC 250 2010 Workshop Manual

Hide thumbs Also See for TC 250 2010:
Table of Contents

Advertisement

Checking coil windings resistance

Remove saddle and fuel tank (see relevant paragraph) to gain access to the
coil (1).
Disconnect the coil connector from the wiring, remove retaining screws and coil
and measure resistance in the primary and secondary windings with a meter.
Inductive coil for fuel-injected TE/TXC 250:
-
Primary winding resistance: 4.5
-
Secondary winding resistance: 19.5 K
cap cable).
Capacitive coil for carburetted TC 250:
-
Primary winding resistance: 0.3
-
Secondary winding resistance: 6.3 K
cap cable).
If resistance is outside the specified limits, replace the coil. Also check the
resistance of the terminal cap contacting the spark plug.
-
Terminal cap resistance: 4.5-5.5 K
If resistance is outside the specified limits, replace the cap.
NOTE: The area where the coil is secured must be totally free from oxide and paint.
A faulty ground contact will damage the coil and cause ignition problems.
Part. N. 8000 H1489 (10-2009)
ELECTRICAL SYSTEM
±15% at 20°C.
±20% at 20°C (without spark plug
±15% at 20°C.
±20% at 20°C (without spark plug
±5% at 20°C.
M.25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2009Txc 250 2010

Table of Contents