Valve Guide Replacement - Husqvarna TC 250 2010 Workshop Manual

Hide thumbs Also See for TC 250 2010:
Table of Contents

Advertisement

ENGINE OVERHAUL
Perform a careful visual inspection of the valve guide.
To determine wear, measure valve to valve guide clearance in the "x" and "y" di-
rections (at right angles to each other) using a suitably positioned dial gauge.
Intake valve: normal clearance: 0.008 - 0.035 mm
Service limit: 0.05 mm (0.0019 in.).
Exhaust valve: normal clearance: 0.018 - 0.045 mm
Service limit: 0.08 mm (0.0031 in.).

Valve guide replacement

Make sure that the cylinder head is not damaged.
Heat up the head in a furnace at 170 °C for 30 minutes.
Remove the valve guide from the cylinder head using a suitable punch.
Part. N. 8000 H1489 (10-2009)
G.5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2009Txc 250 2010

Table of Contents