Installing The Processor Drawer; Inspecting The Contents - Gateway ALR 8200R User Manual

Gateway alr 8200r user's guide
Table of Contents

Advertisement

Installing the Processor Drawer

This processor drawer is a 4U system, meaning that it requires 7
1.
vertical inches (1.75" x 4) of rack space for installation. Check the
rack configuration to make sure you have at least this much space. You
may have to remove blank panels or rearrange existing drawers to
provide enough clearance.
Protect the system from extreme temperature and humidity. Position
2.
the rack away from direct sunlight, heater ducts, and other heat-
generating objects.
3.
Keep your system away from equipment that generates magnetic
fields. Even a telephone placed too close to the system may cause
interference.
If the new system drawer is configured for AC operation, protect it
4.
against AC line spikes by using a 3-prong, 115-V or 230-V
(depending on the voltage supplied in your locality), and an AC surge
control outlet station. The system may require two separate AC outlets
(one per power supply).

Inspecting the Contents

Unpack the carton and inspect the contents. Standard systems include the
following items:
System Drawer
Power Cable(s)
User's Guide
Utilities
Enhanced Keyboard
Mouse
Check the packing list to ensure that all equipment and associated manuals
are included in your shipment. Inspect everything carefully. If you suspect
any damage from shipping, contact Technical Support immediately
Important!
Keep the product carton
and foam packing, in case
you have to ship the
system.
If you return the system in
different packaging, your
warranty may be voided.
.

Installing the Processor Drawer

7

Advertisement

Table of Contents
loading

Table of Contents