Standard Procedure - Valve Timing Verification; Timing Belt Cover(S) - Front; Removal - Chrysler 2004 Concorde Service Manual

Hide thumbs Also See for 2004 Concorde:
Table of Contents

Advertisement

LH
VALVE TIMING (Continued)
1 - TIMING BELT COVER - RIGHT REAR
2 - TENSIONER-TIMING BELT
3 - CAMSHAFT SPROCKET
4 - BOLT-CAMSHAFT SPROCKET
5 - TIMING BELT
6 - CRANKSHAFT SPROCKET
7 - CRANKSHAFT DAMPER
STANDARD PROCEDURE - VALVE TIMING
VERIFICATION
(1) Refer to Camshaft Sprocket Removal procedure
for verification of valve timing (Refer to 9 - ENGINE/
VALVE
TIMING/TIMING
SPROCKETS - REMOVAL)
Fig. 133 TIMING DRIVE SYSTEM
BELT/CHAIN
AND
8 - BOLT-CRANKSHAFT DAMPER
9 - TIMING BELT COVER-LOWER
10 - TIMING BELT COVER-RIGHT
11 - TIMING BELT COVER-LEFT
12 - TENSIONER PULLEY
13 - BOLT-CAMSHAFT SPROCKET
14 - CAMSHAFT SPROCKET
TIMING BELT COVER(S) -
FRONT

REMOVAL

(1) Disconnect negative cable from remote jumper
terminal.
(2) Remove upper radiator crossmember. (Refer to
23 - BODY/EXTERIOR/GRILLE OPENING REIN-
FORCEMENT - REMOVAL)
(3) Remove the radiator fan (Refer to 7 - COOL-
ING/ENGINE/RADIATOR FAN - REMOVAL)
(4) Remove the accessory drive belts. (Refer to 7 -
COOLING/ACCESSORY DRIVE/DRIVE BELTS -
REMOVAL)
(5) Remove crankshaft vibration damper. (Refer to
9
-
ENGINE/ENGINE
DAMPER - REMOVAL)
ENGINE 9 - 79
BLOCK/VIBRATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

300m

Table of Contents