Input Carrier Disassembly - JLG 15MVL Series Service Maintenance Manual

Hide thumbs Also See for 15MVL Series:
Table of Contents

Advertisement

SECTION 3 - BASE COMPONENTS

Input Carrier Disassembly

1. Remove Retaining Rings (G18) from each of the
three Planet Shafts (G6).
NOTE: Do not overstress these Retaining Rings when
removing them.
2. Remove Thrust Plate (G23).
3. Remove Thrust Washer (G25) from each Planet
Shaft (G6).
4. Slide each Input Planet Gear (G5) off the Planet
Shaft (G6).
5. Press out Bushing (G26) from the bore of each
Planet Gear (G5). Bushings cannot be reused when
removed.
6. Remove the other Thrust Washer (G25) from each
Planet Shaft (G6).
7. Remove Retaining Ring (G24) from Output Sun
Gear (G8).
8. Slide Output Sun Gear (G8) out from the center of
the Input Carrier (G7).
3-10
Input Carrier Disassembly
9. Remove the three Planet Shafts (G6) from the Input
Carrier.
NOTE: The Planet Shafts (G6) are held in with a press fit.
To avoid damage to the parts, use an arbor or
hydraulic press to remove the Planet Shafts (G6).
– JLG Lift –
3121231

Advertisement

Table of Contents
loading

This manual is also suitable for:

20msp series20mvl series15msp series

Table of Contents