Cover Removal/Installation - JLG 15MVL Series Service Maintenance Manual

Hide thumbs Also See for 15MVL Series:
Table of Contents

Advertisement

SECTION 4 - CONTROL COMPONENTS

Cover Removal/Installation

THE MAIN CIRCUIT BOARD AND THE SMALLER LCD CIRCUIT
BOARD MOUNTED TO THE COVER ASSEMBLY, COMMUNICATE
THROUGH A RIBBON CABLE. REMOVE THE COVER CAREFULLY
ONCE THE COVER SCREWS ARE REMOVED FROM THE BACK OF
THE MODULE.
Cover Installation
1. Remove the (6) Hex Socket Screws from the Heat Sink/
Base. One screw is under the Warranty/Tamper Label.
3
2
1
Disconnect the Ribbon Cable
1. Ribbon Cable Connector
2. Ribbon Cable
4-10
1
3. Support for Cover
– JLG Lift –
1
1
Release Ribbon Cable
1. Ribbon Cable Connector Tabs
(Push tabs away from connector to release
cable then slide cable out of connector)
Note: Connector works same at both ends of the ribbon cable.
1
1
Reconnecting Ribbon Cable
1. Ribbon Cable Connector Release Tabs
(Slide cable into connector then push tabs
back into connector)
Note: Connector same at both ends of the ribbon cable.
3121231

Advertisement

Table of Contents
loading

This manual is also suitable for:

20msp series20mvl series15msp series

Table of Contents