JLG 15MVL Series Service Maintenance Manual page 124

Hide thumbs Also See for 15MVL Series:
Table of Contents

Advertisement

SECTION 6 - TROUBLESHOOTING
Continuity Measurement
Figure 6-3. Continuity Measurement
• Some meters require a separate button press to
enable audible continuity testing
• Circuit power must be turned OFF before testing con-
tinuity
• Disconnect component from circuit before testing
• Use firm contact with meter leads
• First test meter and leads by touching leads together.
Meter should produce an audible alarm, indicating
continuity
6-4
Current Measurement
Figure 6-4. Current Measurement (DC)
• Set up the meter for the expected current range
• Be sure to connect the meter leads to the correct
jacks for the current range you have selected
• If meter is not auto ranging, set it to the correct range
(See multi meter's operation manual)
• Use firm contact with meter leads
– JLG Lift –
3121231

Advertisement

Table of Contents
loading

This manual is also suitable for:

20msp series20mvl series15msp series

Table of Contents