Table 2-2. MVL/MSP - Preventive Maintenance & Inspection Schedule.
AREA ON MACHINE
MAST ASSEMBLY
Mast Sections
Chain Systems
Sequence Cable Systems
Covers or Shields
Sheave Systems
Bearings
Slide Pads
PLATFORM ASSEMBLY
Platform
Guard Rails
Gate
Floor
Extension Deck Assembly
Lanyard Anchorage Point
CHASSIS ASSEMBLY
Pot Hole Protection System
Battery and Valve Covers or Doors
Static Strap
Caster Wheels
Drive Wheels
Gear Box Assembly *
Drive Motor Brushes **
Brake Release
FUNCTIONS/CONTROLS
Platform Controls
Ground Controls
Function Control Locks, Guards, or Detents
Function Enable System
Emergency Stop Switches (Ground & Platform)
Function Limit or Cutout Switch Systems
Drive Brakes
Manual Descent or Auxiliary Power
POWER SYSTEM
Batteries
Battery Charger
HYDRAULIC/ELECTRIC SYSTEM
Hydraulic Pump
Hydraulic Cylinder
Cylinder Attachment Pins and Pin Retainers
Hydraulic Hoses, Lines, and Fittings
Hydraulic Reservoir, Cap, and Breather
Hydraulic Filter
3121231
3 MONTH
PRE-START (a)
PREVENTATIVE
INSPECTION
MAINTENANCE
7
7
7
1, 2
14
1, 7, 9, 11
7
19
9
– JLG Lift –
SECTION 2 - GENERAL
INTERVAL
6 MONTH
PRE-DELIVERY (b)
PREVENTATIVE
OR FREQUENT (c)
MAINTENANCE
INSPECTION
2, 5
14
3, 14
3
1, 2
1
1, 2, 4
1, 5
1, 2
1, 5
1, 4
5
1, 7
1, 2
2
5
5, 6, 7
5, 6
5
5
5
9
1, 2, 9
2, 7, 9
1, 2
1, 9
5, 7
ANNUAL (d)
(YEARLY)
INSPECTION
2, 5
14, 25
1, 2, 3
1
1, 2
1, 2
1, 2
1
1, 2, 4
1, 5
1, 2
1, 5
1, 4
5
1, 7
1
1, 2
2
—
5
5, 6, 7
5, 6, 14
5
5
5
5
18
5
1, 2, 5, 9
2, 9
1, 2
1, 9
5, 7
2-3