Battery - Installation - (2-12V Batteries) - JLG 15MVL Series Service Maintenance Manual

Hide thumbs Also See for 15MVL Series:
Table of Contents

Advertisement

SECTION 4 - CONTROL COMPONENTS

Battery - Installation - (2-12V Batteries)

To gain access to the batteries, requires opening or
removal of the upper half of the rear covers, see Section
4.2, Controls Cover Installation.
Procedure for removal is same for both batteries.
On installation, batteries set in machine with the posts to
the inside. Left side battery (–) NEG post at front (shown
below), Right side battery (+) POS post towards machine
front.
Battery Installation (Left Side Battery Shown)
1. Battery (a)
3. Battery Terminal Attach Nut/Washer (b)
2. Hold-Down Bar
4. Hold-Down Bar Wing-nut and Washer
NOTE: (a) Mount with terminal posts inboard.
(b) Apply battery terminal grease to prevent corro-
sion.
4-6
– JLG Lift –
3121231

Advertisement

Table of Contents
loading

This manual is also suitable for:

20msp series20mvl series15msp series

Table of Contents