JLG 15MVL Series Service Maintenance Manual page 89

Hide thumbs Also See for 15MVL Series:
Table of Contents

Advertisement

1
2
Transducer Sensor Installation (Typical)
1. Mounting Screws (a)
2. Bushings
3. Transducer Sensor (b)
Notes: (a) Apply Loctite 222 to screw threads and torque to
15 in. lb.
(b) Mount sensor with (circular) membrane
facing down.
1
Secure Transducer Sensor Wiring
1. Nylon Tie Wraps (a)
Note:(a)Secure ALL sensor wire cables to platform side
frame.
3121231
2
3
4
5
4. DO NOT Pressure Wash Decal
5. Sensor Side Deflector
2
2. Platform Floor Supports
SECTION 4 - CONTROL COMPONENTS
3
2
1. Sensor Side Deflector (a)
2. Pop Rivet
Note: (a) One deflector required on each side of platform.
Deflector must be even with, and not extend inside
of the platform side frame.
– JLG Lift –
1
Sensor Side Deflectors
3. Platform Side Frame
4-33

Advertisement

Table of Contents
loading

This manual is also suitable for:

20msp series20mvl series15msp series

Table of Contents

Save PDF