Sun Microsystems Ultra 27 Service Manual page 118

Sun ultra 27 workstation
Hide thumbs Also See for Ultra 27:
Table of Contents

Advertisement

Index
diagnostics (Continued)
shut down option, 105
system information menu options, 91-92
DIMMs, adding or replacing, 53-56
E
environmental specifications, 111-112
ESD precautions, 31
expansion slots, 108
F
fan, replacing, 69-72
front panel, 15-16
G
graphics card
replacing, 56-60, 60
H
hard drives, cables, 78
heat sink and CPU, replacing, 78-84
I
I/O board assembly, front panel view, 15-16
IEEE 1394, 78, 108
installation
bezel removal, 33-34, 34-35
opening the workstation, 31-34
postinstallation instructions, 34
preinstallation instructions, 31-32
removing access panel, 35-36
118
Sun Ultra 27 Workstation Service Manual • June 2009, Revision A
M
maintenance procedures
access panel installation, 35-36
bezel installation, 34-35
bezel removal, 33-34
postinstallation precautions, 34
preinstallation instructions, 31-32
required tools and supplies, 31
memory, See DIMMs
motherboard
installing, 85-87
replacing, 84-87, 87
O
opening the workstation, 31-34
P
PCI slot specifications, 108
PCI, adding and removing cards, 64-67
PCIe2
adding and removing cards, 56-60
adding supplementary power, 60-63
physical specifications, size and weight, 110
power supply, power specifications, 110-111
powering on and off, 30-31
precautions for installation, ESD, 31
R
replacing
battery, 67-69
DIMMs, 53-56
graphics card, 56-60, 60
heat sink and CPU, 78-84
I/O board assembly, 75-77
motherboard, 84-87, 87
PCIe cards, 56-60
system cables, 77-78
system fan, 69-72
required tools and supplies, 31

Advertisement

Table of Contents
loading

Table of Contents