Engine Bolts And Nuts; Cylinder Head Nuts And Cylinder Nuts; Exhaust Pipe Nuts - Suzuki RG250 Service Manual

Table of Contents

Advertisement

PERIODIC MAINTENANCE AND TUNE-UP
PROCEDURES
2-4
ENGINE BOLTS AND NUTS
Tighten 1 000 km
,
6 000 km
,
12 000
k m,
18
000 km
,
24
000 km
, 1
600
miles,
4
000
miles,
7500
miles,
"000 mil
es, 15
000
miles)
CY
LINDER HEAD
NUTS AN
D
CY
LI
NDER
NUT
S
Remove the seat and frame covers
(right
and
leftl.
Remove the fuel tank (Refer
to
papge
3-2)
Remove the midd le and lower cowling
(Refer
to page
7-2)
Remove the radiator (Refer to page .4.3)
Tighten the cylinder head bolts and nuts to the
spec ified torque with a torque wrench
sequen-
tially
in ascending numerical order with the
engine cold.
Bmm
23
-
27 N-m
Tightening
12.3 -
2.7
kg-ml
torque
6mm
9-11N'm
10.9
-
1.1
kg-ml
Tighten the cylinder nuts to the specified torque.
Tighten ing torque
6
-
9 N'm
10.6
-
0.9 kg-mJ
EX HA
UST PIPE
NUTS
Tighten
the exhaust pipe nuts
to
the speci
fied
torque.
Tightening
torque
lB
-
2BN'm
I1.B
-
2.B
k9-ml
\
!

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents