Chassis Bolts And Nuts - Suzuki DR-Z70 Service Manual

Table of Contents

Advertisement

2-17
PERIODIC MAINTENANCE

CHASSIS BOLTS AND NUTS

Tighten initially at 1 month and every 6 months thereafter.
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to the locations of the fol-
lowing bolts and nuts on the motorcycle.)
1 Front axle nut
2 Handlebars set bolts
3 Front fork upper bracket bolts
4 Footrest mounting bolts
5 Rear shock absorber mounting nuts (Upper and Lower)
6 Swingarm pivot nut
7 Brake cam lever nuts (Front and Rear)
8 Rear axle nut
ITEM
N·m
kgf-m
53
5.3
23
2.3
45
4.5
23
2.3
50
5.0
42
4.2
3
0.3
54
5.4
lb-ft
38.5
16.5
32.5
16.5
36.0
30.5
2.0
39.0

Advertisement

Table of Contents
loading

Table of Contents