Chassis Bolts And Nuts - Suzuki RV125 Service Manual

Hide thumbs Also See for RV125:
Table of Contents

Advertisement

2-20
PERIODIC MAINTENANCE

CHASSIS BOLTS AND NUTS

Tighten initially at 1 000 km (5 months) and every
4 000 km (20 months) thereafter.
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-21 for the loca-
tions of the following bolts and nuts on the motorcycle.)
1 Handlebar clamp bolt
2 Steering stem head nut
3 Front fork upper clamp bolt
4 Front fork lower clamp bolt
5 Front fork cap bolt
6 Front axle
7 Front axle pinch bolt
8 Front brake caliper mounting bolt
9 Front brake hose union bolt
0 Front brake caliper air bleeder valve
A Front brake master cylinder mounting bolt
B Swingarm pivot nut
C Rear axle nut
D Rear shock absorber mounting bolt/nut
(Upper & Lower)
E Front footrest bolt
F Rear brake cam lever nut
G Rear sprocket mounting nut
H Spoke nipple
Item
N·m
23
90
23
33
23
65
23
39
23
7.5
10
65
65
50
94
7
60
4.5
kgf-m
2.3
9.0
2.3
3.3
2.3
6.5
2.3
3.9
2.3
0.75
1.0
6.5
6.5
5.0
9.4
0.7
6.0
0.45

Advertisement

Table of Contents
loading

Table of Contents