Suzuki RG250 Service Manual page 73

Table of Contents

Advertisement

3·37
ENGINE
Position the kick starter shaft with return
spring.
Align the spring hook
CD
with slot
®
of
lower
crankcase.
Check the
movement of
the countershaft and
drive shaft for
smoot
hness when gea
r
posi
tion
is in
neu
tra
l.
Apply Suzuki Bond No.
120 7B
to
the mating
surface of the
upper
crankcase and part of lower
crankcase in
the
farrowi ng procedure.
99000-3
1140
Suzuk
i
Bond No. 1207B
NOTE:
Use of Suzu
k
i Bond
No.
12078 is as follows:
II
Make surface free from
moisture, oil,
dust
and other foreign
materials.
II
Spread on surfaces thinly to form and
even layer and assemble the cases within
few minutes.
II
Take extreme care not to apply any bond
No.
12078 to the bearing
surfaces.
Applicable on distorted surface
as
it forms
a comparatively thick film
.
Tighten the upper and lower crankcase bolts
to
the specified torque
values.
6mm
6 N·m
Ini
tial
(0
.6 kg-ml
tig
htening
13 N·m
torque
8mm
(1.3
kg-m
l
Be
ca
reful
of the
position of
t
he clamp
when
tighten ing
the
upper crankcase
bolts.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents