Quick Steps Of Installation - Teletek electronics ECLIPSE 8 Installation Manual

Alarm control panel
Hide thumbs Also See for ECLIPSE 8:
Table of Contents

Advertisement

Eclipse 8/ 32 Series - Installation Manual

QUICK STEPS OF INSTALLATION

Step 1
Working plan-diagram of the system
Draw out a working plan diagram of the site and locate the elements of the alarm control system on it. Choose the best
place for installation of the detectors, control keyboards and other system devices.
Step 2
Installation of the control panel
Choose a place for installation of the control panel close to mains power 220V and telephone line terminals. Choose
the most appropriate openings for running the power supply cable, zone wires, PGM outputs and the system BUS.
Mount the bottom of the box on the wall as use the supplied on the back side of the package template for drilling.
Mount a tamper-switch and level it according the installation surface to provide the box self-protection. Connect the
wires of the tamper-switch to that zone considered to be TAMPER type.
ATTENTION: The initial power-up of the panel is only after completing all the wiring of the system!
Step 3
Connecting devices to the system BUS
Connect all keyboards and expander modules to the control panel using 4-wire alarm cable (system BUS). It is
obligatory to follow the correspondence of the colors between control panel and keyboard/ additional devices terminals.
Use the detailed connection diagrams provided in item 2.4 of this manual.
Step 4
Connecting of zones
Connect the detectors in the zones as use one of the following connection diagrams according the respective
application. According your system you can choose among different connection styles diagrams:
ECLIPSE 8 – 5 connection styles diagrams for single zone connection
ECLIPSE 32 – 9 connection diagram styles for single and doubling zone connection
Use the detailed connection diagrams provided in item 2.3 of this manual.
Step 5
Connecting of sirens, PGM outputs and other devices
Connect the sirens, controlling devices (such as proximity card readers or remote controls), the digital communicator,
communicator modules, etc. Use the detailed connection diagrams provided in items 2.5-8 of this manual.
Step 6
Initial power-up of the control panel
1. Set a jumper to RESET terminal of the main control panel Eclipse (see the general connection diagram).
2. Power the control panel from the mains 220V.
.
3
Connect the battery wires to accumulator battery 12V/7Ah for back-up power supply as strictly observe the polarity:
red wire to "+" battery terminal, black wire to "-".
4. The backlights of all connected to the system BUS control keyboards light up and a procedure for
Initial initialization starts running. Wait for 15-20 sec until ending of initialization procedure. Now the system is ready for
registration of devices.
5. Press the ENT () button of all connected to the system BUS keyboards one-by-one – this is the way to register the
keyboards to the control panel. Press the little button (located between the two terminal rows) of all expanding modules
connected to the system BUS to register them to the control panel. A confirmation sound signal is heard – see also the
other ways for registration of devices to the control panel described in item 5.
ATTENTION: DO NOT press the PRG button of any of the keyboards during the registration procedure. Otherwise,
you will register the keyboard as "Service keyboard"!
6. Remove the jumper from RESET terminal.
7. Wait until the system BUS LED stops blinking in green.
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eclipse 32Eclipse 16

Table of Contents