Operator Panel; Removal; Replacement - IBM 265 Service Manual

Table of Contents

Advertisement

Operator Panel

The following procedures cover removal and replacement of the operator panel.

Removal

1. If you have not already done so, shut down the system as described in "Stopping
the System" on page 248.
2. If you have not already done so, unplug the system power cables from the electrical
outlets.
3. Remove the bezel as described in "Bezels" on page 253.
4. Remove the operator panel by grasping the release levers and pulling the operator
panel tray from the system.
5. If installed, remove the cables from the disk drive.
6. Disconnect the cables from the operator panel and remove the operator panel.

Replacement

1. To replace, perform removal steps in reverse order.
2. Complete the VPD update procedure as described in "System Vital Product Data
(VPD) Update Procedure" on page 278.
Chapter 9. Removal and Replacement Procedures
277

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intellistation power 9112 265

Table of Contents