IBM 265 Service Manual page 112

Table of Contents

Advertisement

Table 2. Firmware Checkpoints. (continued)
Checkpoint
E177
E178
E17B
E180
E183
E190
E193
E196
E19B
E19C
E19D
E19E
96
Service Guide
Description
Transfer failure due to TFTP error
condition
Create PCI token ring node
Processor frequency measurement
Service processor command setup
Service Processor POST
Create ISA node
Initialize Super I/O.
Probe ISA bus.
Create service processor node.
Create tablet node.
Create NVRAM node.
Real time clock (RTC) creation and
initialization.
Action/ Possible Failing FRU
Refer to "Boot Problems/Concerns" on
page 106 for general considerations.
1. Turn off, then on, and retry the boot
operation.
2. Verify boot list by using the firmware
SMS Multiboot menus.
3. Verify the network connection
(network could be down).
4. Have network administrator verify
the server configuration for this
client.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
1. Replace battery, restore NVRAM
data (passwords, startup data)
2. Replace the system board.
Location: P1
See note 3 on page 109.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.
Go to MAP 1540: Minimum
Configuration, "Step 1540-24" on
page 77.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intellistation power 9112 265

Table of Contents