IBM 265 Service Manual page 103

Table of Contents

Advertisement

Table 1. Service Processor Checkpoints. (continued)
Checkpoint
Description
E0C0
Starting X5 BIST
E0D0
Creating JTAG scanlog (This procedure
could take several minutes.)
E0E0
Pulling processor card out of the reset
state.
E0E1
Pull processor card out of reset: okay
OK
Service Processor Ready. Waiting for
power-on normal operation
STBY
Service processor is ready. The
operating system has been terminated;
the system is still powered on.
Action/ Possible Failing FRU
See "Error Codes E0A0, E0B0, E0C0,
E0E0, E0E1 and 40A00000 Recovery
Procedure" on page 170.
Call support
See "Error Codes E0A0, E0B0, E0C0,
E0E0, E0E1 and 40A00000 Recovery
Procedure" on page 170.
See "Error Codes E0A0, E0B0, E0C0,
E0E0, E0E1 and 40A00000 Recovery
Procedure" on page 170.
Press the system unit's power button to
power-on the system unit.
This usually indicates an operating
system crash. The service processor
menus are available. Look for error
codes related to the operating system
crash in the service processor error log.
Chapter 4. Checkpoints
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intellistation power 9112 265

Table of Contents