IBM 265 Service Manual page 102

Table of Contents

Advertisement

Table 1. Service Processor Checkpoints. (continued)
Checkpoint
E080
E081
E0A0
E0B0
86
Service Guide
Description
Entering service processor recovery
flash update process.
Flash update completed - system reboot
in progress
Beginning bring-up phase
Starting processor BIST
Action/ Possible Failing FRU
1. Do the following flash recovery
procedure:
a. Insert a newly formatted DOS
diskette loaded with service
processor firmware into the
diskette drive. The file name
must be spflash.img .
Note: Insert the diskette after
checkpoint E080 is displayed on
the operator panel.
b. Shut down the system unit and
unplug the power cable.
c. Plug in the power cable,
power-on the system unit.
2. Retry item 1 with a newly formatted
DOS diskette.
3. Replace the system board.
Location: P1
(See note 3 on page 109.)
1. Unplug the power cable.
2. Plug in the power cable, power-on
the system unit.
3. Do the following flash recovery
procedure:
a. Insert a newly formatted DOS
diskette loaded with service
processor firmware into the
diskette drive. The file name
must be spflash.img .
Note: Insert the diskette after
checkpoint E080 is displayed on
the operator panel.
b. Shut down the system unit and
unplug the power cable.
c. Plug in the power cable,
power-on the system unit.
4. Retry the flash recovery procedure
with a newly formatted DOS
diskette.
5. Replace the system board.
Location: P1
(See note 3 on page 109.)
See "Error Codes E0A0, E0B0, E0C0,
E0E0, E0E1 and 40A00000 Recovery
Procedure" on page 170.
See "Error Codes E0A0, E0B0, E0C0,
E0E0, E0E1 and 40A00000 Recovery
Procedure" on page 170.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intellistation power 9112 265

Table of Contents