Preparations For Engine Installation; Transport; State Of Delivery; Engine Preservation - Rotax 914 series Installation Manual

914 series
Hide thumbs Also See for 914 series:
Table of Contents

Advertisement

9) Preparations for engine installation

■ CAUTION:
9.1)

Transport

The engine to be lifted by two hooks or straps around the middle of the intake manifolds.
See section engine views, numbering of cylinders and definition of main axes.
9.2)

State of delivery

It is possible to mount the engine to a palet using steel angles.
■ CAUTION:
9.3)

Engine preservation

The engine is preserved at BRP-Rotax thus warranting proper protection against
corrosion for at least 12 month after date of delivery from BRP-Rotax.
This warranty is subject to the following conditions:
-
the engine has to be stored in the packing as supplied by BRP-Rotax.
-
the covers on various openings must not be removed (see section of protective
covering)
-
engine has to be stored in a suitable place (at min. - 40 °C (- 40 °F) and max.
+ 80 °C (+ 176 °F)).
If the engine is stored for a period longer than 12 month perform every 3 months the
tasks given in the current valid Maintenance Manual, section 11.11.1 "Preservation of
a new engine".
Effectivity: 914 Series
Edition 2 / Rev. 0
BRP-Rotax
INSTALLATION MANUAL
The stated directives are measures to pay CAUTION to at engine
installation to prevent any accidents and engine damage.
The attachment screws are only for transport and must not be used in
the aircraft.
page 31
July 01/2008

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

914 ul 3

Table of Contents