2) Requirements On The Intercooler - Rotax 914 series Installation Manual

914 series
Hide thumbs Also See for 914 series:
Table of Contents

Advertisement

16.2.2) Requirements on the intercooler:

Effectivity: 914 Series
Edition 2 / Rev. 0
INSTALLATION MANUAL
Notes regarding too high air temperatures in the air box:
If in case of high intake air temperature the max. air temperature in the airbox is
frequently or permanently above the limit, the arrangement of air intake has to be
improved or an intercooler has to be installed.
◆ NOTE:
Intercooler is not in the supply volume.
Intercooler has to be installed between pressure side of turbo (2) and inlet (3)
into airbox.
-
a minimum flow rate of 300 m
conditions
-
the pressure loss must not exceed 15 hPa
■ CAUTION:
No additional forces or moments are allowed on turbo charger
or airbox, therefore the intercooler has be supported inde-
pendent and free of vibrations.
2
1
BRP-Rotax
3
/h (390 yd
3
Ladeluftkühler
(Intercooler)
3
/h) has to be warranted for all
08416
Fig. 59
July 01/2008
page 99

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

914 ul 3

Table of Contents