Preparations For Engine Installation; Transport; State Of Delivery; Engine Preservation - Rotax 912 Series Installation Manual

912 series
Hide thumbs Also See for 912 Series:
Table of Contents

Advertisement

9) Preparations for engine installation

■ CAUTION:
9.1)

Transport

The engine to be lifted by two hooks or straps around the middle (A) of the intake
manifolds.
See chapter engine views, numbering of cylinders and definition of main axes.
9.2)

State of delivery

The engine could be attached with to steel angles anchored on a timber plate.
■ CAUTION:
9.3)

Engine preservation

The engine is preserved at BRP-Rotax thus warranting proper protection
against corrosion for at least 12 month after date of delivery from BRP-Rotax.
This warranty is subject to the following conditions:
-
the engine has to be stored in the packing as supplied by BRP-Rotax.
-
the covers on various openings must not be removed (see section of
protective covering)
-
engine has to be stored in a suitable place (at min. - 40 °C (- 40 °F) and max.
+ 80 °C (+ 176 °F)).
If the engine is stored for a period longer than 12 month perform every 3 months
the tasks given in the current valid Maintenance Manual, section "Preservation
of a new engine".
Effectivity: 912 Series
Edition 1 / Rev. 0
BRP-Rotax
INSTALLATION MANUAL
The stated directives are measures to pay CAUTION to at engine
installation to prevent any accidents and engine damage.
The attachment screws are only for transport and must not be
used in the aircraft.
page 31
May 01/2007

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 uls 3

Table of Contents