Non-Blocking Architecture; Power On Maintenance; Programming Devices - Panasonic DBS 576 HD Technical Manual

Hide thumbs Also See for DBS 576 HD:
Table of Contents

Advertisement

Section 700 - Operation

Non-Blocking Architecture

Description
The System is totally non-blocking. All extension and outside lines are available for use at the same
time.
Hardware Requirements
The CPC-HS supports 64 (max. 28 extensions). The CPC-HM supports up to 116 ports (max. 60
extensions).
Related Programming
N/A
Considerations
N/A

Power On Maintenance

Description
The System allows you to change most circuit cards, programming, and many other maintenance
features while the System is powered on and operating. Very few operations require the System to be
powered down or out of service. The System therefore continues to operate without interruption for
most maintenance functions.
A limited number of items such as the replacement of some common control circuit cards requires the
system to be powered down.
Hardware Requirements
N/A
Related Programming
N/A
Considerations
N/A

Programming Devices

Description
The dealer may program the System either by using:
A digital key telephone equipped with display.
DBS 576 Manager.
576-50-700
DBS 576HD (USA) issued September 2001
Chapter 7. SLT Features
3-47

Advertisement

Table of Contents
loading

Table of Contents