Tools and Equipment Needed
To install the system, you must have the following tools:
No. 2 Phillips screwdriver
■
ESD mat and grounding strap
■
In addition, you must provide a system console device, such as one of the following:
ASCII terminal
■
Workstation
■
Terminal server
■
Patch panel connected to a terminal server
■
Related Information
"Optional Component Installation" on page 5
■
Optional Component Installation
The standard components of the server are installed at the factory. However, if you
ordered options such as additional memory or PCI cards, these options will be
shipped separately. If possible, install these components prior to installing the server
in a rack.
If you ordered any options that are not factory-installed, see the SPARC Enterprise
T5120 and T5220 Servers Service Manual for installation instructions.
Note – The list of optional components can be updated without notice. See the
product web pages for the most current list of components supported in the server.
Related Information
Sun SPARC Enterprise T5120 and T5220 Servers Documentation
■
SPARC Enterprise T5120 Server Getting Started Guide
■
SPARC Enterprise T5220 Server Getting Started Guide
■
SPARC Enterprise T5120 Server Getting Started Guide (DC)
■
Preparing for Installation
5