30. Align the valve body assembly on the transmission case
and install the manual valve lever to manual valve link. Fit
the long end of the link to the manual valve first. Install the
securing bolts and tighten to specification in the specified
sequence. Refer to figure 8.61.
Figure 8.61 - Tightening Sequence Valve Body to Case
31. Check the alignment of the detent roller and the manual
lever quadrant.
32. Connect the solenoid wiring as detailed below:
Solenoid 1 - red
Solenoid 2 - bIue
Solenoid 3 - yellow
Solenoid 4 - orange
Solenoid 5 - green
Solenoid 6 - violet (Refer to figure 8.62.)
Notice
All hardware must be correctly installed and torqued to
specification.