Daewoo MUSSO Service Manual page 1103

Hide thumbs Also See for MUSSO:
Table of Contents

Advertisement

5A-124 AUTOMATIC TRANSMISSION
27. Install the line pressure plug and tighten to specification.
Refer to figure 8.62.
Figure 8.62 - Wiring Installation
28. Install the detent spring assembly (spring, support plate
and screw), ensuring that the screw is tightened to
specification. Check the spring for wear or damage.
29. Install the manual shift valve. Refer to figure 8.60.
Notice
Be aware that the manual valve will fall out of the valve
body.
Figure 8.60 - Manual Shift Valve

Advertisement

Table of Contents
loading

Table of Contents