Honda CBR954RR 2002 Service Manual page 86

Hide thumbs Also See for CBR954RR 2002:
Table of Contents

Advertisement

Route the drive chain through the swingarm as
shown.
Never reuse the old drive chain, master link, master
link plate and O-rings.
Assemble the new master link, O-rings and plate.
insert the master
inside of the drive
chain, and instaii
the plate with the
identification mark
facing out
Assemble and set the drive chain tool set.
TOOL:
Drive chain
Make sure the master link pins are installed properly.
Measure the master link pin length projected f r o m the
plate.
STANDARD LENGTH:
DID : 1.15
Stake the master link pins.
tool
set
(U.S.A. only)
-
-
1.55 mm (0.045
0.061 in)
-
- 1.4 mm
(0.05
0.06
in)
O-RINGS
MASTER LINK
DRIVE CHAIN TOOL SET
or
MASTER LINK PINS
MAINTENANCE
PLATE
3-23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents