Honda CBR954RR 2002 Service Manual page 62

Hide thumbs Also See for CBR954RR 2002:
Table of Contents

Advertisement

FRAME/BODY PANELS/EXHAUST SYSTEM
Connect the EGCV control cables to the cable pulley.
Install the EGCV pulley cover and tighten
the specified torque.
TORQUE: 12 N-m (1.2 kgfsm, 9 Ibf-ft)
Clamp the 0 2 sensor wire to the right step guard.
Install the rear master cylinder, collars and right step
guard, then tighten the mounting bolts.
Clamp the
hose using the hose clamp.
sensor wire with the rear brake reservoir
PUL L EY
the bolts t o
CONTROL CABLES

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents