Honda CBR954RR 2002 Service Manual page 77

Hide thumbs Also See for CBR954RR 2002:
Table of Contents

Advertisement

MAINTENANCE
Measure the shim thickness and record it.
Sixty-five different
shim thicknesses
Calculate the n e w shim thickness using the equation
from
1200
rnm
in
A:
New shim thickness
B: Recorded valve clearance
C: Specified valve clearance
D: Old shim thickness
Make sure o f the correct shim thickness b y measur-
ing the shim w i t h a micrometer.
calculated dimension
Install the newly selected shim on the valve retainer.
and valve iifters in
Apply molybdenum disulfide
Install the valve lifters into the valve lifter holes.
locations
Install the camshafts (page 8-24).
Rotate the camshafts by rotating the crankshaft clock-
wise several times.
Recheck the valve clearance.
Remove the cam chain tensioner holder.
Install the new sealing washer and cam chain ten-
sioner lifter sealing bolt.
Tighten the bolt securely.
Install the removed parts in the reverse order of
removal.
3-14
+
of
over 2.800 mm.
oil
t o the valve lifters.
SHIM
I
I
1.80 mm
1.825 mm
CAM CHAIN TENSIONER HOLDER
CAM CHAIN TENSIONER LIFTER
1.85 mm
1.875 m m
BOLT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents