Overcurrent Protection Requirements

The following protections against excessive current loads must be satisfied before
servers that use DC input power can be installed:
Overcurrent protection devices must be provided as part of each equipment rack.
Circuit breakers must be located between the DC power source and the server. Use
one 20A fast-trip, double-pole, DC-rated circuit breaker for each power supply
unit.
Note – Overcurrent protection devices must meet applicable national and local
electrical safety codes and be approved for the intended application.
Related Information
"Assembling and Installing the DC Input Power Cables" on page 83
Assembling and Installing the DC Input
Power Cables
These topics explain how to assemble and install DC input power cables.
"Assemble the DC Input Power Cable" on page 83
"Install the Strain Relief Housings" on page 89
"Connect the DC Input Power Cords to the Server" on page 91

▼ Assemble the DC Input Power Cable

The following procedure describes how to assemble the DC input power cables for
Oracle's Sun SPARC Enterprise T5140 server.
Assembling and Installing DC Power Cables for the Sun SPARC Enterprise T5140 Server