Overcurrent Protection Requirements - Oracle Sun SPARC Enterprise T5140 Installation Manual

Table of Contents

Advertisement

Related Information
"Overcurrent Protection Requirements" on page 95

Overcurrent Protection Requirements

The following protections against excessive current loads must be satisfied before
servers that use DC input power can be installed:
Overcurrent protection devices must be provided as part of each equipment rack.
Circuit breakers must be located between the DC power source and the server. Use
one 40 A fast-trip double-pole DC-rated circuit breaker for each power supply
unit.
Note – Overcurrent protection devices must meet applicable national and local
electrical safety codes and be approved for the intended application.
Related Information
"Assembling and Installing the DC Input Power Cables" on page 95
Assembling and Installing the DC Input
Power Cables
These topics explain how to assemble and install DC input power cables.
"Assemble the DC Input Power Cables" on page 95
"Connect the DC Input Power Cords to the Server" on page 99
▼ Assemble the DC Input Power Cables
The following procedure describes how to assemble the DC input power cables for
Oracle's Sun SPARC Enterprise T5240 server.
Assemble one cable for each DC power supply in your server.
Assembling and Installing DC Power Cables for the Sun SPARC Enterprise T5240 Server
95

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sun SPARC Enterprise T5140 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sun sparc enterprise t5240

Table of Contents