Maple Systems Silver Series Installation And Operation Manual page 61

Operator interface terminal
Hide thumbs Also See for Silver Series:
Table of Contents

Advertisement

56
Saving your first project
1. From the File menu, click Save As. The Save As dialog box appears.
2. Use the drop-down menus to locate the project folder.
3. In the File name text box, type MTPrj1.
4. Click Save. The file is saved onto your computer hard drive and the main screen of
EasyBuilder reappears.
Compiling your first project
1. From the Tools menu, click Compile. The Compiling dialog box appears.
1010-1007W, Rev 06
If you haven't already done so, now would be a good time to connect the OIT to the
computer and to connect the PLC that you are using to the OIT For more information,
consult the first part of this chapter or see "Installation of OITs" later on in this
manual.
Sil ver Se ries In stal la tion & Op er a tion Man ual

Advertisement

Table of Contents
loading

Related Products for Maple Systems Silver Series

This manual is also suitable for:

Hm15070thHm15100t

Table of Contents