Maple Systems Silver Series Installation And Operation Manual page 48

Operator interface terminal
Hide thumbs Also See for Silver Series:
Table of Contents

Advertisement

Cre ating Your First Project
4. In the Start Degree, type 270
5. In the End Degree box, type 90.
6. Uncheck "Full Circle".
7. Check Enable in the tick marks section.
8. Select black as the tick marks color.
9. Select main scale 6, sub. scale 1, length 6 for tick marks.
10. Select pointer arm style and length.
11. Click on the Limits tab.
12. Set value 0, Span 100.
13. Enable range limits and select low, mid and high colors. Width = 3.
14. Click OK.
15. Click the work area to place the meter.
16. On the main screen of EasyBuilder, you will see a white square outline that is attached to your
cursor in the work area. This represents the meter display just created. Click to place the
meter display in Window #11.
17. Now, resize the meter so that it is a better fit on the popup window. Double click on the
meter display to re-display the attribute dialog.
18. Click the Profile tab to display the profile form.
19. Enter the following values:
X: 45
Y: 13
Width: 120
Width: 120
20. Click OK.
To create a numeric register on Window#11
1. From the Objects menu, click Numeric/ASCII - Numeric Display. The New Numeric
Display dialog box appears.
2. Type Numeric Data in the Description box.
3. Click OK.
4. On the main screen of EasyBuilder, you will see a white rectangle outline that is attached to
your cursor in the work area. This represents the numeric register just created. Click to place
43
1010-1007W, Rev 06

Advertisement

Table of Contents
loading

Related Products for Maple Systems Silver Series

This manual is also suitable for:

Hm15070thHm15100t

Table of Contents